Akce
Quality #107
otevřenýAudit point 2.2
Začátek:
Uzavřít do:
% Hotovo:
0%
Odhadovaná doba:
WCM pilíř:
Oddělení:
Popis
2)QM Step 1 ~ Step 4 applied using basic PPA for model quality issues related to machines.
- Carry out restoration based on the design and check results.
- Formulate a system concerning the design of restoring and the preparation of components replacement.
Akce